AUH Freezone works

Project Details

The AUH Freezone Electrical Works project entailed critical modifications and electrical upgrades to the Main Distribution Board (MDB) system for KC Manufacturing LLC at the Abu Dhabi Airport Freezone. The project aimed to modernize the electrical infrastructure to meet current operational demands, improve efficiency, and ensure compliance with safety standards.

Client

KC Manufacturing LLC

Consultant

Winner Holistic consultants

Scope of Work

MDB (Modific- ation & Electrical Works

Location

Abudhabi Airport Freezone

Project Summary

The AUH Freezone Electrical Works project focused on the modification and upgrade of the Main Distribution Board (MDB) at the Abu Dhabi Airport Freezone for KC Manufacturing LLC. The project, overseen by Winner Holistic Consultants, involved enhancing the facility’s power distribution system, ensuring efficient energy management, and meeting safety standards. The scope of work included MDB modification, conduit and cable installation, and comprehensive testing to ensure operational efficiency. The project was completed successfully, with minimal disruptions and full compliance with regulatory standards.

Overview & Challenge​

1. Maintaining Operations During Upgrades:
One of the main challenges was executing the MDB modifications without disrupting the ongoing operations of KC Manufacturing LLC. Ensuring that power supply to key areas remained uninterrupted while carrying out electrical upgrades required meticulous planning and phased execution.

2. Limited Space for Infrastructure Expansion:
The existing electrical infrastructure had limited space for the new conduit and cable installations. Our team had to carefully assess the available space and develop creative solutions to ensure efficient cable management while adhering to safety standards.

3. Strict Compliance Requirements:
Working within the Abu Dhabi Airport Freezone meant adhering to stringent regulatory and safety standards. Meeting these requirements while executing complex electrical works required close collaboration with Winner Holistic Consultants and constant adherence to compliance guidelines.

4. Tight Project Timeline:
The project had to be completed within a tight timeline to align with the client’s operational needs. Managing the schedule effectively while maintaining high standards of quality was a key challenge that our team successfully overcame.